Sunlit resort swimming pool surrounded by palms Aerial view of a hotel resort pool Aerial view of a water park with slides Hotel pool and water feature surrounded by tropical greenery

A PowerShift Alliance Partner

Engineered efficiency
for every pool, resort
& facility.

We reduce wasted electricity in the pumps, motors and HVAC systems behind public pools, resorts, water parks, spas and commercial buildings — without touching water quality, comfort or guest experience.

USA · Thailand · UK · Ireland Backed by the global PowerShift Alliance engineering network

Get your free efficiency estimate

Tell us about your site — we'll come back with where the waste is and what it's costing you.

No obligation. We reply within one business day.
4Regions served — US, Thailand, UK & Ireland
3Step engineering process — understand, optimize, verify
5Global hospitality brands served via the Alliance network
1Business day average response time

Who we help

If it moves water, air or heat — we can find the waste.

School and competition swimming pool with lap lanes

Public & community pools

Lower the running cost of pumps and filtration without changing water quality or safety compliance.

Aerial view of a hotel resort pool

Resorts & hotels

Protect the guest experience while cutting the electricity bill behind pools, plant rooms and HVAC.

Aerial view of a water park with slides

Water parks & leisure

High-volume pumping is the single biggest energy line item on site — usually the biggest opportunity too.

Hotel pool and water feature surrounded by tropical greenery

Spas & wellness facilities

Pumps, jets and heating run long hours for a small footprint — efficiency gains compound fast.

Commercial & retail business

Any site running commercial pumps, motors or HVAC at scale is a candidate for an efficiency review.

What we do

We don't just install equipment.
We engineer the whole system around what it actually needs.

  • 01
    Energy audit & site assessmentA clear, no-obligation read on where pumps, motors and HVAC are working harder than they need to.
  • 02
    AI-managed connected technologySmart, connected control systems selected and configured to match the real application, not a catalogue default.
  • 03
    Commissioning & optimizationEvery system is tuned and verified on site — not just switched on.
  • 04
    Monitoring & measurementOngoing visibility into consumption and performance, so savings are proven, not assumed.
  • 05
    Support & maintenanceLocal service backed by a global engineering network, for the life of the system.
  1. UnderstandWe assess the application on site and establish a real baseline.
  2. OptimizeWe engineer, program and commission the right AI-managed connected technology for the job.
  3. VerifyWe monitor performance so the savings are measured, not just promised.

Some projects can be structured so the savings help fund the work — ask us about shared-savings options for your site.

Hotel swimming pool and landscaped hospitality grounds

Keep the experience. Lose the waste.

Guests never see the plant room — they just feel the difference in a well-run property.

Why it matters

Lower bills. Less strain on ageing equipment. No compromise on guest experience.

Pumps, motors and HVAC are usually sized for a worst-case day, then left to run at full output every day. That gap between what's installed and what the application actually needs is where the waste — and the opportunity — lives.

We find it, engineer around it, and prove the result with real measurement, so the case for the next project makes itself.

Trusted expertise, delivered locally

From a quiet resort pool to a busy water park — the engineering scales.

High-turnover aquatic facilities put the most hours on the most equipment. That makes them some of the fastest-paying-back efficiency projects we see — and some of the most rewarding to get right.

Talk to us about your site
Water park pools and slides

Built for high-volume sites

Water parks and leisure attractions run pumps hard, every day of the season.

What working with us looks like

Real engineers. Real facilities. A measurable difference.

Total Power Group engineer and resort maintenance engineer together at a pool plant room
On-site, side by sideWe work alongside your own maintenance team, not around them.
Water park management team and an efficiency engineer reviewing results together
Results your team can seeClear, easy-to-read reporting — not just an invoice.
Energy efficiency dashboard showing a consumption trend
Measured, not assumedOngoing monitoring shows the trend, not just a one-off estimate.

Illustrative imagery — not photographs of a specific completed project or a verified customer result.

Where we work

Local contacts, one engineering standard.

United States

Commercial and hospitality efficiency projects across the US market.

Thailand

Our home base — resorts, hotels and public pools across Thailand.

United Kingdom

Serving England and the wider UK, from leisure centres to commercial sites.

Ireland

Extending the same engineering standard to facilities across Ireland.

Get in touch

Tell us about your site.
We'll tell you where the waste is.

Fill in the form and a member of The Total Power Group will get back to you — usually within one business day. No obligation, no pressure.

Submitting this form sends your details directly to The Total Power Group. We never share your information with third parties.

Contact

Talk to a human, not a call centre.

Paul “Tonks” Tonkin, owner

Tonks

Owner · Global

paul@thetotalpowergroup.com Phone & WhatsApp — to be confirmed
WhatsApp Free assessment